top of page
Elighten-1 (9).png

Need help getting started? Shop the necessary parts for a complete install:

Track/Channel & LEDs

Control Box

Wiring

Accessories

Required Elements:

Notes:

Link:

Measure roofline to determine required amount of linear footage. Order number of feet (recommended to order 5% more than needed incase of errors while installing. 

Purchase WLED enabled control box. You can choose a pre-assembled box, or purchase all components to DIY and/or fully customize. Essential elements are an enclosure, mounting plate, power supply, control board. extension wire and pigtails.  

End Caps

Data Boosters

Various wiring elements will be required for installation. Specific requirement will vary depending on the size and shape of the home. xConnect extensions and pigtails will allow you to run power and data from the control box to your runs of lights. 

End caps are not required, but are recommended to prevent weather damage to end of runs. Purchase 2x for each unique run. Data boosters are required when spanning large distances. 

TUTORIAL VIDEOS

Track and Channel Install

This video details how to install the track and channel on your home. 

Navigating Peaks

This video will show you how to dive into a roofline and make the peak cuts. 

90 Degree Turn

Watch this video to learn how to navigate a 90 degree turn when installing your lights. 

WLED VIDEOS

Basic Controls

How to control your lights once connected to the app.

WLED Presets

Set up preset lighting conditions in the app.

bottom of page